Fulton Hogan deliver paving efficiency at Wellington Airport
Categories:
Tags:
Wellington Airport’s apron taxiway was set to undergo major reconstruction for the first time since the airport opened in 1959. The apron taxiway consists of the paved area between the runway and the airport terminal. This area had reached the end of its design life and needed to be resurfaced… Read More